This list of seismically-isolated buildings and other structures in the United States has been
developed by the Protective Systems Research Group of the Earthquake Engineering
Research Center at the University of California at Berkeley. The list was last updated in May 1997. We welcome any comments
or additions to this list so that we can keep it up to date. For instructions, please go to our feedback page.
Seismically Isolated Buildings and Other Structures in the United States
| No. | Name | Location | Owner | Engineer | Contractor | Super- Structure | Eq. Design Spectrum | Isolation System/ Supplier | Remarks |
| 1 | Foothill Communities Law & Justice Center New, 1985 | Rancho Cucamonga, CA | County of San Bernardino | Taylor & Gaines; Reid & Tarics | McCarthy/ Obayashi | 230,000 sq.ft. 4-story steel | - | 98 HDR (LTV) | - |
| 2 | Standford Linear Accelerator Center Mark II Detector Retrofit, 1987 | Menlo Park, CA | Standford Linear Accelerator Center | - | - | 3 million pound Mark II Detector | DBE A = 0.6g S1 | 4 LRB (DIS/Furon) | - |
| 3 | Evans & Sutherland Building 600 New, 1988 | Salt Lake City, Utah | The Evans & Sutherland Corp. | Reaveley Engineers & Assoc. | The Bettilyon Corp. | 190,000 sq.ft. 4-story steel | DBE A = 0.25g S1 | 40 LRB 58 NRB (DIS/Furon) | - |
| 4 | Standford Linear Accelerator Center Mark II Detector New, 1988 | Menlo Park, CA | Standford Linear Accelerator Center | - | - | 1.3 million pound Calorimeter | DBE A = 0.6g NRC | 4 LRB (DIS/Furon) | It was necessary to provide seismic integrity while on its temporary support structure during assembly. |
| 5 | Salt Lake City and County Building, Retrofit, 1989 | Salt Lake City, Utah | Salt Lake City Corporation | E.W Allen & Associates | Jacobsen Constr=2E | 170,000 sq.ft. 5-story unreinforced brick & sandstone | DBE A = 0.2g S2 | 208 LRB 239 NRB (DIS/Furon) | The base structure is topped off with a clock tower that exceeds 250 ft=2E in height. |
| 6 | Fire Command and Control Center New, 1990 | East Los Angeles, CA | County of Los Angeles | Fluor-Daniel Engineers, Inc. | Fluor-Daniel Engineers, Inc. | 32,000 sq.ft. 2-story steel | - | 32 HDR (Fyfe Assoc., Dynamic Rubber) | - |
| 7 | USC University Hospital New, 1991 | Los Angeles, CA | National Medical Enterprises, Inc. | KPFF Consultng Engineers, Inc. | J.A. Jones Construction Co. | 350,000 sq.ft. 7-story steel | DBE A = 0.4g S1 | 68 LRB 81 NRB (DIS/Furon) | - |
| 8 | Rockwell International Corporate Headquarters (Building 80) Retrofit, 1991 | Seal Beach, CA | Rockwell International | Englekirk & Sabol, Inc. | Morley Construction | 260,000 sq.ft. 8-story concrete | DBE A = 0.55g S1 | 52 LRB 26 NRB (DIS/Furon) | - |
| 9 | Marina Apartment Retrofit, 1991 | San Francisco, CA | Dr. Hawley | EPS | - | 20,000 sq.ft. | - | 31 FPS (EPS) | - |
| 10 | Kaiser Permanente Regional Data Center New, 1992 | Corona, CA | Kaiser Permanente Foundation | Taylor & Gaines | Turner Construction Company | 120,000 sq.ft. 2-story steel | DBE A = 0.6g S1 | 26 LRB 28 NRB (DIS/Furon) | - |
| 11 | Two Residences New, 1992 | West Los Angeles, CA | David Lowe | David Lowe | - | 4,700 sq.ft. ea. | - | GERB Resistant Base (GERB) | - |
| 12 | Titan Solid Rocket Motor Storage 1992 | Vandenburg Air force Base, CA | U.S. Air Force | Bechtel National, Inc. | - | N/A | - | HDR (LTV) | - |
| 13 | Portland Water Bureau Water Control Center New, 1993 | Portland, Oregon | Portland Water Bureau | Harris Group, Inc. | Koll Construction | 14,000 sq.ft. 2-story steel | DBE A = 0.3g S1 | 31 LRB 4 NRB (DIS) | - |
| 14 | Campell Hall Retrofit, 1993 | Monmouth, OR | Western Oregon State College | Van Domele, Looijenga, McGarrigle, Knauf | Colamette Construction Co. | 30,000 sq.ft. 3-story unreinforced masonry | DBE A = 0.3g S1 | 26 LRB 16 NRB (DIS) | - |
| 15 | Mackay School of Mines Retrofit, 1993 | Reno, Nevada | University of Nevada, Reno | Jack Howard & Assoc.; BIC | - | 27,000 sq.ft. | - | HDR, Sliding bearings (Furon) | - |
| 16 | Emergency Operations Center New, 1994 | Los Angeles, CA | County of Los Angeles | DMJM | - | 33,000 sq.ft. | - | 28 HDR (Bridgestone) | - |
| 17 | Traffic Management Center New, 1994 | San Diego, CA | Caltrans/CHP | Forell/Elsesser | - | 45,000 sq.ft. | - | 44 HDR (Bridgestone) | - |
| 18 | Hughes Building S-12 Retrofit, 1994 | El Segundo, CA | Hughes Aircraft Company | Brian L. Cochran Associates | Morley Construction Co. | 240,000 sq.ft. 12-story | DBE A = 0.32g S2 | 24 LRB 21 NRB (DIS) | - |
| 19 | Oakland City Hall Retrofit, 1994 | Oakland, CA | City of Oakland | Forell/Elsesser Engineers, Inc=2E | Overaa/Miller | 153,000 sq.ft. 18-story steel | DBE A = 0.48g S2 | 42 LRB 69 NRB (DIS) | - |
| 20 | U.S. Court of Appeals Retrofit, 1994 | San Francisco, CA | U.S. General Services Administration | Skidmore, Owings & Merril | - | 350,000 sq.ft. | - | 256 FPS (EPS) | - |
| 21 | San Francisco Main Library New, 1995 | San Francisco, CA | The City of San Francisco Bureau of Architecture | Olmm Structural Design | Huber, Hunt & Nichol, Inc | 377,000 sq.ft. 7-story steel | DBE A = 0.48g S2 | LRB (DIS/Furon) | - |
| 22 | Martin Luther King/Drew Trauma Center New, 1995 | Los Angeles, CA | Los Angeles County | John A. Martin & Assoc. | Turner Construction Company | 75,000 sq.ft. 6-story | DBE A = 0.55g S2 | 70 HDR (DIS/Furon) | - |
| 23 | AutoZone Headquarters New, 1995 | Memphis, Tenn. | AutoZone Corporation | JMGR, Inc. Structural Division | Inman Construction Corp. | 210,000 sq.ft, 8-story concrete | DBE A = 0.16g S2 | 24 LRB 19 NRB (DIS) | - |
| 24 | Long Beach V.A. Hospital Retrofit, 1995 | Long Beach, CA | Department of Veterans Affairs | Nabih Youssef & Associates | Dillingham Construction | 350,000 sq.ft. 12-story R.C. | DBE A = 0.6g S1 | 110 LRB 18 NRB (DIS/Furon) | - |
| 25 | Missouri Botanical Garden Research Center New, 1996 | St. Louis, MO | - | Dames & Moore | - | 4-story steel frame | - | 44 HDR (Skellerup) | - |
| 26 | Kerckhoff Hall Retrofit, 1996 | UCLA Campus, Los Angeles, CA | UCLA | Brandow & Johnston Assoc. | Ray Wilson Company | 92,000 sq.ft. 6-story R.C./Brick | DBE A = 0.6g S1 | 33 LRB 93 NRB (DIS/Furon) | - |
| 27 | Hayward City Hall New, 1997 | Hayward, CA | City of Hayward | KPFF Consultng Engineers, Inc. | DRR | 100,000 sq.ft. | - | 53 FPS (EPS) 15 Viscous Dampers (Taylor) | - |
| 28 | San Bernardino County Medical Center New, 1997 | Colton, CA | San Bernardino County | KPFF Consulting Engineers | JCM Group | 1,000,000 sq.ft. steel | DBE A = 0.7g S2 | 400 HDR (DIS) 186 Viscous Dampers (Taylor) | A total of five buildings are included on the campus. |
| 29 | Washigton State E.O.C. New, 1998 (est.) | Camp Murray, WA | - | - | - | - | - | FPS (EPS) | - |
| 30 | Public Safety Bldg. New, 1998 (est.) | Berkeley, CA | - | Olmm | N/A | Steel frame | - | N/A | - |
| 31 | San Francisco Airport International Terminal New, 1998 | San Francisco, CA | - | Skidmore, Owings & Merril | Herrick/PDM | 1.6 million sq.ft. | - | 272 FPS (EPS) | 20 in. dis. capacity 6% dyn. friction 3 sec. period |
| 32 | San Francisco 911 New, 1998 (est.) | San Francisco, CA | - | Forell/Elsesser Engineers, Inc. | S.J. Amoroso | Steel frame | - | HDR (BTR/Andre) | - |
| 33 | San Francisco City Hall Retrofit, 1998 (est.) | San Francisco, CA | City & County of San Francisco | Forell/Elsesser Engineers, Inc. | Huber Hunt & Nichol, Inc. | 550,000 sq.ft. 5-story | DBE A = 0.5g S2 | 530 LRB (DIS) | - |
| 34 | Los Angeles City Hall Retrofit, 1999 (est.) | Los Angeles, CA | City of Los Angeles | N. Youssef & Assoc./ SIE | Lehrer McGovern & Bovis | 912,000 sq.ft. | - | approx. 450 HDR, approx. 70 Sliding bearings (Bridgestone), approx. 70 viscous dampers (Taylor) | Viscous dampers are also used in the isolation system and at one level of the tower superstructure. |
| 35 | LAC + USC Medical Center New, 2000 (est.) | East Los Angeles, CA | County of Los Angeles | KPFF | Turner Construction Company | 550,000 | - | 150 HDR (BTR/Andre) | Under redesign due to project budget cutbacks |
| 36 | Asian Art Museum Retrofit, Planned | San Francisco, CA | City & County of San Francisco | Forell/Elsesser | - | 170,000 sq,ft. | - | System not yet selected | - |
| 37 | Channing House Retrofit, Planned | Palo Alto, CA | Channing House | Rinne & Peterson | Anderson Pacific Engin. Constr. | 260,000sq.ft. 11-story R.C. | DBE A = 0.55g S2 | 56 LRB 56 NRB (DIS/Furon) | - |
| 38 | Seattle Standpipe & Water Tank Planned | Seattle, Washington | Seattle Water Department | Cygna Group Inc. (ICF Kaiser) | - | 6 million and 2 million gallon water tanks | - | (System: N/A) | - |
FPS = friction pendulum system HDR = high damping rubber LRB = lead-rubber bearing NRB = natural rubber bearing |