Image-B3201
Left: Bridge 161 over Little Rann of Kutch (looking south) and settlement behind north abutment. Right: Bridge bearings shifted a short distance on some piers.
|
|
|
Image-B3202
Bridge No. 245 (meter gauge) near Samakhiali.
|
|
|
Image-B3203
Bridge No. 245 (meter gauge) near Samakhiali - Temporary repairs.
|
|
|
Image-B3204
Bridge no. 261 - Failed spandrel walls and displaced stones in arch ring due to abutment movement.
|
|
|
Image-B3205
Bridge 261 (meter gauge). Repairs to arch ring: joints grouted, temporary support.
|
|
|
Image-B3206
Bridge No. 271. Failure of spandrel wall and separation of wing wall on opposite side of tracks.
|
|
|
Image-B3207
Broad Gage [Standard gauge] Bridge No. 48 near Bhuj: (a) General view of bridge, (b) Cracked joints in arch, (c) Falsework. Bridge was originally built as meter gage, widened with cast-in-place concrete extensions on both sides. Earth pressure against spandrel walls opened joints next to stones bonded to new concrete.
|
|
|
Image-B3208
Pier with cracked mortar joints repaired by epoxy grouting and cast-in-place concrete repairs. Broad gauge Bridge No. 290.
|
|
|
Image-B3209
Pier with cracked mortar joints repaired by epoxy grouting.
|
|
|
Image-B3210
Pier with crack in horizontal mortar joint stabilized with rails set in concrete.
|
|
|
Image-B3211
Concrete pedestals supporting viaduct cracked and shifted. Viaduct was temporarily supported on "Christchurch cribs." Left: Station and pedestrian viaduct over yard at Samakhiali. Right: Detail of viaduct damage.
|
|
|
Image-B3212
Left: Embankment settlement and cracking between Bhachau and Chirai. Right: Track has been raised on excess ballast to compensate for settlement.
|
|
|
Image-B3213
Destroyed train depot on the left and temporary depot at Bhatiya on the right.
|
|
|
Image-B3214
Railway owned employee housing and temporary shelters at Bhatiya.
|
|
|
Image-B3215
Damage to train station at Morbi Junction.
|
|
|
Image-B3216
Left: Temporary repairs to stone masonry arch bridge, built in 1912. Right: Damage to another railway masonry arch bridge.
|
|
|
Image-B3218
Beginning of approximately 1 km of track settlement due to liquefaction on Dahinsara-Navlakhi line near Navlakhi Port. (Rails have been removed.) Line was reconstructed on new alignment.
|
|