The Earthquake Engineering Online Archive NISEE e-LibraryWilliam G. Godden Collection: GoddenA66
Description: Highway bridge. Girder consists of a 4-web T-section over the length subjected to positive bending. Near abutments, where there is negative bending, a partial lower flange is used, tapering from the full width at the abutment to zero at the inflexion point. (Near Geneva, Switzerland)
See also:
To view MrSID images, download the ExpressView Browser plug-in from LizardTech. Please address questions about reproduction and use of images to NISEE. |