Technical Studies

Earthquake Ground Motions with 10% Probability of Exceedence in 50 Years

Boston

The table below provides detailed information on the records generated for Boston having probabilities of exceedence of 10% in 50 years. These acceleration time histories have been derived from historical recordings or from physical simulations and have been altered so that their mean response spectrum matches the 1997 NEHRP design spectrum, modified from soil type of SB-SC to soil type SD and having a hazard specified by the 1997 USGS maps.

There are 20 different horizontal components (10 2-component records). Each original historical ground motion pair has typically been altered in the following way:

Additional details can be found from the main Ground Motions page. This page also provides a link to a draft report summarizing all of the SAC Phase 2 ground motion studies.

To see the acceleration time history of any of the ground motions listed in the table below, just click on the ground motion name.

Details of Boston Ground Motions Having a
Probability of Exceedence of 10% in 50 Years
SAC
Name
RecordEarthquake
Magnitude
Distance
(km)
Scale
Factor
Number
of Points
DT
(sec)
Duration
(sec)
PGA
(cm/sec2)
BO01 Simulation, hanging wall 6.5 30 0.39 3000 0.01 29.99 121.97
BO02 Simulation, hanging wall 6.5 30 0.39 3000 0.01 29.99 72.93
BO03 Simulation, foot wall 6.5 30 0.54 3000 0.01 29.99 141.37
BO04 Simulation, foot wall 6.5 30 0.54 3000 0.01 29.99 109.65
BO05 New Hampshire, 1982 4.3 8.4 10.75 3847 0.005 19.23 564.78
BO06 New Hampshire, 1982 4.3 8.4 10.75 3847 0.005 19.23 309.51
BO07 Nahanni, 1985 6.9 9.6 0.09 4068 0.005 20.335 86.29
BO08 Nahanni, 1985 6.9 9.6 0.09 4068 0.005 20.335 81.18
BO09 Nahanni, 1985 6.9 6.1 0.2 3752 0.005 18.755 59.48
BO10 Nahanni, 1985 6.9 6.1 0.2 3752 0.005 18.755 72.23
BO11 Nahanni, 1985 6.9 18 0.92 3804 0.005 19.015 130.69
BO12 Nahanni, 1985 6.9 18 0.92 3804 0.005 19.015 133.21
BO13 Saguenay, 1988 5.9 96 1.57 3548 0.005 17.735 196.50
BO14 Saguenay, 1988 5.9 96 1.57 3548 0.005 17.735 284.44
BO15 Saguenay, 1988 5.9 98 3.21 2958 0.01 29.57 513.58
BO16 Saguenay, 1988 5.9 98 3.21 2958 0.01 29.57 243.68
BO17 Saguenay, 1988 5.9 118 3.25 3906 0.01 39.05 179.47
BO18 Saguenay, 1988 5.9 118 3.25 3906 0.01 39.05 222.98
BO19 Saguenay, 1988 5.9 132 3.34 3325 0.01 33.24 172.96
BO20 Saguenay, 1988 5.9 132 3.34 3325 0.01 33.24 267.23


SAC Steel Project | 1301 S. 46th Street | Richmond, CA 94804-4698 | http://www.sacsteel.org/